Operating Requirements for Screws Through the Wall

Jul 03, 2020

Leave a message

The most prominent advantage of the operation of the wall screw is that the time of demolition is very fast, and very simple, when cleaning is very simple, and in the process of operation is usually required to clean up, with the corresponding operating procedures:

 

1. For the new wall-through screw-eye cleaning, then need for the screw eye's sticky part of the debris is needed to clean up, but also need to screw the inside of the debris tool for timely cleaning, wait until the clean-up is completed after the use of a fan to blow it clean.

 

2. We can use the bristles of the wire brush, clean the part of the screw eye, around the surrounding part of the one-time bristles, and then use a hairdryer to blow it clean.

 

3. Sprinkle water on top of the new wall screw, can make it become moist, is the use of spray wet method, in the construction of an hour before the spray, so that the surrounding part of the screw eye has been maintained in a humid state, the construction process needs a small amount of water spray can be facilitated construction.

 

4. The operation of the new wall screw needs to be irrigated mortar, wherein the cement mortar use of the seal is the need and the same label between the structure cement mortar, the use of cement has a best way, is to use the same structure of cement, cement using iron wipes in a certain proportion in a slightly expanded cement to add waterproof powder, and then this directly in the eyes of the screw, this practice is the first end blocked, in the part of the cast, using a screw, using a screw The other part of the end uses mortar to secure it and then plug the other end.

Send Inquiry