Inspection and maintenance of precision parts processing machine tools
Aug 21, 2020
Leave a message
1. Carry out cleaning treatment. After the machining center completes the cutting task, it must clean up the chips and wipe the machine in time, and keep the machine and the environment clean.
2. For inspection and replacement of accessories, first pay attention to checking the oil wiping plate on the guide rail. If it is worn out, replace it in time. Check the status of lubricating oil and coolant. If turbidity occurs, it should be replaced in time. If the water level is below the scale, it should be added.
3. The shutdown procedure should be standardized, and the power supply and the main power supply on the machine operation panel should be turned off in sequence. In the absence of circumstances and requirements, the principles of first zero return, manual, jog, and automatic should be followed. The machining center should also run at low speed, medium speed, and then high speed. Low-speed and medium-speed running time shall not be less than 2-3 minutes before starting to work without abnormal conditions.
4. Standard operation, can not knock, correct or correct the workpiece on or at the chuck, confirm that the workpiece and tool are clamped before proceeding to the next operation. The safety and protection devices on the machine tool must not be disassembled or moved arbitrarily.
