Ground Screw Mounting Process

Jul 01, 2020

Leave a message

1. Verticality of the foot bolts

The foot bolts should be mounted vertically and without tilting.

 

2. Laying of the foot bolts

In the installation of ground-foot bolts, often encountered is the dead foot bolts of secondary grout, that is, when watering the foundation, in advance on the foundation set aside the reserved hole of the foot bolts, installation equipment on the foot bolts, and then with concrete or cement mortar to water the foot bolts to death.

 

3. Ground bolt mounting - tightening

4. Do a good job of the corresponding foot bolt installation construction records

 

Foot bolt installation process should be done in detail the corresponding construction records, a true reflection of the foot bolt model, specifications and other content, for future maintenance, replacement to provide effective technical information.

 

General installation accuracy of high pre-buried must first make a cage (must first wear on the bolthole of the pre-buried steel plate, and loaded with nut compression. The pre-buried parts are tied to the template and secured before pouring, so that the mounting size of the foot bolts can be guaranteed. If you want to save materials, you can also use rebar welding fixed, after welding need to proofage the geometry. At this point, the foot bolt installation is really complete.