Operation Preparation Of The Pipe Bender

Apr 09, 2014

Leave a message

Before the operation of the pipe bender, it is necessary to check whether the oil level of its fuel tank has reached the oil level line, and then refuel at each smooth point of the equipment. When the equipment recognizes the rotation of the motor, it needs to be useful to check whether the oil pump has abnormal sound. Check the hydraulic system for any oil leaks after starting the machine.

Please contact us at zhang@pride-cnc.com

34

Send Inquiry