Elements Of Technical Realization Of Railway Coupler Interconnection Difference Processor

Sep 13, 2022

Leave a message

Technical implementation elements:

4. The purpose of the present utility model is to solve at least one of the technical problems existing in the prior art, and to provide a railway coupler inter-coupling difference processor, through the upper and lower chains, to prevent the main rod from detaching and causing injury to the operator. Two people can carry the tool and adjust the height of the coupler, which can quickly adjust the height of the coupler and shorten the working time of the operator.

27

Contact Us:

Email: zhang@pride-cnc.com

Tel: +86-755-23699351

Mob: +8618666663894


Send Inquiry