When processing any product, we have certain technical requirements for processing, instead of processing it casually, the operator needs to make it according to the above requirements, and the automatic part processing is the same, so automation What are the technical requirements for parts processing?
One: When assembling the hydraulic system, it is allowed to use seal packing or sealant, but it should be prevented from entering the system.
Two: The parts and components entering the assembly must have the certificate of the inspection department before they can be assembled.
Three: The tolerance of the unmarked shape should meet the requirements of GB1184-80, and the allowable deviation of the unmarked length dimension is ±0.5mm.
Four: The fasteners with specified tightening torque requirements must be tightened with torque wrenches and tightened according to the specified tightening torque.
Five: Strictly check and remove the sharp corners, burrs and foreign objects remaining during parts processing before assembly. Ensure that the seal is not scratched when it is installed.
Six: The parts must be cleaned up and cleaned before assembling, and there must be no burrs, flashes, oxide scales, rust, chips, oil stains, colorants and dust.
Seven: After assembly, the outer ring of the bearing and the end surface of the bearing cap of the positioning end should contact evenly. There should be no scratches, scratches and other defects that damage the surface of the part on the processed surface of the part.