Cable Rope Setting Specification Requirements

Jun 22, 2020

Leave a message

1. the top cable rope of the upright dhow should be set for 6-8, the tilt lifting mast should be added to the rear main cable air rope, the number of rear main cable air rope should not be less than 2.

 

2. the angle between the cable and the ground should be 30 degrees, the maximum should not exceed 45 degrees.

 

3. the horizontal angle between the adjacent cable air ropes of the upright mast shall not be greater than 60 degrees.

 

4. the cable air rope should be set up to prevent the carriage force after the production of a twisting facilities.

 

5. need to move the mast should be set up a spare cable air rope.

Send Inquiry