Assemble the frame 3

Mar 17, 2022

Leave a message

Assemble the frame 3.

For larger boxes, the sides can be split into sections. These sections end with straight cuts (not 45⁰ corners). Utilize three (3) straight brackets connecting two adjacent sections. The screws will be tightened from the inside of the frame. Sections can be identified by matching numbers.

SEG-LED Single sided

Pride is deeply engaged in hardware manufacturing industry. Every month we have a large number of hardware parts, fasteners, pipe products, telescopic products exported to all parts of the world.

Please contact us at zhang@pride-cnc.com


Send Inquiry